Plant maintenance · Confined space
Boiler and Silo Cleaning, Slag and Bunker Maintenance
Silo cleaning comes up when a build-up interrupts flow and holds up production. We clean material stuck to silo walls, slag in a boiler’s combustion chamber and bridging in a bunker, entering from above on ropes and working to your plant’s shutdown schedule.
Every entry starts with a confined space permit: nobody goes in without measurements, ventilation, isolation of energy and a standby person waiting outside.

Silo Cleaning: Wall Build-Up and Bridging
Bridging
The material forms an arch above the outlet and flow downwards stops.
Rat-holing
Flow only happens through the middle; the material at the edge stays in place and hardens over time.
Wall build-up
A layer hardened by moisture coats the wall; the hopper gets smaller and is loaded unevenly.
Cleaning always starts from the top. The technician descends from the top hatch on a rope and brings the build-up down in stages; scraping from below can bring a mass hanging above down onto the person working.
The same principle applies to silos for cement, lime, ash, soda and granular products; the tools are chosen, according to how hard the material is, from hand tools through to pneumatic breakers.
Slag Cleaning: Boiler Interior and Heating Surfaces
In solid-fuel boilers, slag sticks to the wall tubes and heating surfaces of the combustion chamber and reduces heat transfer. If the accumulated mass breaks off by itself, it can damage the equipment below.
The work is done during a planned shutdown, after the boiler has cooled. Erecting scaffolding in tall combustion chambers can extend a shutdown by days; the team descending on ropes breaks off the slag stuck to the tubes and removes the soot and ash deposits on the same descents.
When the job is finished, we hand photos of the tube surfaces to the plant’s maintenance team; any points showing wear are marked separately.

Shutdown schedule
Tell Us Your Shutdown Date and We Will Set Up the Team Accordingly
Maintenance shutdowns are mostly known months ahead. If you share the date, the equipment to be cleaned and the approximate dimensions, we will work out the number of people and the shift pattern together.
Bunker Cleaning and Flow Problems
- Material jammed and hanging up in coal and biomass bunkers
- A layer building up around the grating and vibrator at the outlet
- Partial blockages that starve the feed line
Industrial Chimney Cleaning: Access from Inside and Outside
We descend inside from the top opening on ropes and clean the deposit starting from the top. All lines connected to the chimney are kept closed until the work is finished, and gas is monitored continuously.
On the outside, the shell, the climbing ladder, the platforms and the lightning conductor connections are checked. Any cracks and corrosion we see are photographed so that they can be entered in the plant’s maintenance plan.
Confined Space Procedure: Permit, Measurement and Standby Person
- 1.An entry permit and a work plan are written; if the plant has its own permit system, its forms are used.
- 2.Material feed and energy are isolated, and valves and switches are locked and tagged.
- 3.Oxygen and toxic gas are measured before entry and monitoring continues throughout the work.
- 4.The hopper is ventilated; if the dust is heavy, suitable respiratory protection is worn.
- 5.A standby person waits outside, in constant communication with those inside.
- 6.A rescue plan and equipment are kept ready at the entry point.
Questions on Plant Cleaning
Drawings or photos of the equipment make the first conversation far more productive.
How is a silo cleaned?
First the silo is emptied, the feed and discharge lines are closed and locked out, and the air inside is measured. A technician descends from the top hatch on a rope and brings down the deposit on the wall from top to bottom in a controlled way. The material that falls is removed from below; when the work is finished, the final condition of the wall is photographed and handed over to the plant.
How is slag cleaned out?
The boiler is taken out of service on a planned shutdown, and we wait until the internal temperature falls to a safe level. The team then enters the combustion chamber and breaks the slag stuck to the tube surfaces with hand and air tools; large pieces are lowered in a controlled way. To avoid damaging the tube surfaces, gradual breaking is preferred to hard blows.
Can the rest of the plant keep running during the cleaning?
Mostly yes, as long as the equipment being cleaned is out of service. The lines connected to the silo or bunker are closed and locked out; the other units keep running. We set up the shifts according to the plant’s production and shutdown plan.