Example building
A 4-storey apartment building with 8 flats, a footprint of 20 × 14 m and a storey height of 2.9 m
- Building perimeter
- 68 m
- Gross facade
- ≈ 789 m²
- After deducting openings
- ≈ 670 m²
- Facade per flat
- ≈ 84 m²
Pricing guide · Last updated 8 November 2026
External wall insulation costs differ from building to building, so this page has no figures, only the items that make them up: how the square metres are measured, what the unit rate depends on, and where the cost comes from with and without scaffolding.
We do not publish prices on the website. We give the exact amount after the site survey; this page is here so that you can read the quotes you receive correctly.
The total of an external wall insulation quote
Net facade area × system unit rate
+ access + extra items
The unit rate depends on the board, its thickness and the building. We give the figure after the site survey, in a quote with every item written separately.
Calculate your facade areaThe building perimeter is multiplied by the number of storeys and the storey height, and the window, door and balcony openings are deducted. This measured area is the multiplier of the quote.
The materials for the board, adhesive, fixings, mesh and render coats, together with the labour of installation, are written per square metre.
On a scaffolded job, hire, transport, erection and dismantling; on a job done on ropes, setting up the anchors on the roof and the descent lines.
Work that not every building needs, such as repairs required before the board goes on, replacing window sills and reveals, or a special top coat.
A 4-storey apartment building with 8 flats, a footprint of 20 × 14 m and a storey height of 2.9 m
In this building, a 100 m² flat is allocated about 84 m² of facade when the cost is shared equally. So a flat’s share of the insulation is not the same thing as the price of 100 m² of facade.
The share is determined by the total facade of the building and the number of flats, or by the land share on the title deed if the flat owners decide so. By dividing the total in the quote by the number of flats or by the land shares, you can find the amount for each flat.
To try it with the dimensions of your own building, you can use the external wall insulation m² calculator.
Stone wool costs more than EPS; the difference comes from the board itself and from the extra fixings it needs. We explain the technical differences between the two boards on our external wall insulation page.
Every extra centimetre adds to both the cost of the board and the length of the fixings. The thickness is set by the climate zone the building is in and the energy class it is aiming for.
As the number of storeys rises, the height of the scaffolding, the number of anchors and the hire period all grow. With rope access, the set-up on the roof is done once and divided into longer descents.
As the number of balconies, projections, reveals and external corners rises, so do the cuts, profiles and descent lines. The difference between a flat facade and a recessed one arises here.
If there is bulging render, a deep crack or a trace of damp, a repair is needed before the board. The repair appears on a separate line in the quote, so it is clear what you are paying for.
Our quotes are based on a standard decorative top coat of render. If a coloured, patterned or stone-effect special finish is wanted, the difference is written separately.
Are the type, thickness and make written down? White EPS and graphite EPS, or 4 cm and 5 cm, are not the same job.
How many fixings go into each square metre depends on the height of the building and the wind load; the number must appear clearly in the quote.
The glass-fibre mesh, the corner and plinth profiles, and the base coat and top coat of render should each be stated separately.
Is putting up scaffolding or ropes included in the unit rate, or on a separate line? If it is not included, the total grows later.
Removing bulging render and repairing cracks should be seen at the survey and written with their quantity; a note saying “carried out if necessary” is not enough.
Whether the figures include or exclude VAT, how many days the job will take, and how payment will be split.
| Item | Scaffolding | Rope access |
|---|---|---|
| Access cost | Hire, transport, erection and dismantling; grows with the height of the scaffold and the hire period | Setting up the anchors and descent lines on the roof; less affected by the height of the building |
| Set-up | Carrying the materials, erection and dismantling take several days | Setting up the anchors and lines on the roof is usually finished on the first working day |
| If the job overruns | The hire keeps running for as long as the job goes on | No extra hire arises; work is charged by the team day |
| Ground and surroundings | Part of the garden and car park stays closed throughout the job | Only a materials area and a safety strip are set aside |
| Windows | The platform and protective netting stay along the facade | The team passes in front of a window only on the day it works there |
| In the evenings | Because the platforms stay on the facade, the flats can be reached from outside | The ropes can be taken up to the roof; no permanent structure is left on the facade |
On a multi-storey block the difference favours rope access, because the scaffold’s hire, transport, erection and dismantling item never reaches the invoice. At the survey we write the two options side by side, so that the difference can be seen on the quote itself.
The decision is not always made on the amount alone: how long the garden and car park will stay closed, the residents’ routine in front of their windows, and whether the job fits within the weather also come into the calculation.

Work that is priced separately is seen at the survey and written into the quote together with its quantity; it is also stated clearly whether VAT is included.
The exact figure depends on four pieces of information: the net square metres to be done, the condition of the wall, the points on the roof where ropes can be tied, and the shape of the facade. None of these can be measured correctly over the phone.
Even so, we can give a preliminary range from photos of the facade and the dimensions of the building. The exact price is fixed in the written quote after the site survey; if any work is added later, we write that up separately too and put it to you for approval.
The price per square metre depends on the type and thickness of the board, the height of the building, the access method and the condition of the wall, so we do not publish a fixed figure on the site. From photos of the facade and the building’s measurements we can give a preliminary range; the exact price is set in the written quote after the site survey.
Labour covers bonding and fixing the boards with plugs, embedding the mesh in the render, the top coat and access to the facade. In our quotes we write labour and materials on separate lines. We recommend choosing the board, adhesive and mesh from the same manufacturer’s system; buying the materials separately can lead to compatibility problems.
Because quotes often do not price the same job: one includes scaffolding and another does not; one specifies 4 cm white EPS and another 5 cm graphite EPS. When you compare, check whether the board type and thickness, the number of plugs per square metre, the type of mesh and the access method are the same.
The total is found by multiplying the net facade area in square metres by the unit price and adding access and, if there is any, repair items. The four-storey, eight-flat example building on the page has about 670 m² of net facade. You can find the facade area of your own building with the calculator, then enter the per-square-metre price from the quote you hold to see the total.
In our written quote the VAT rate and amount appear on a separate line. When you compare quotes, check whether the figures are given including or excluding VAT; the difference between two quotes may come from that alone.
Some banks offer loans or instalment options for thermal insulation and energy efficiency; the conditions vary by bank and by period. The application usually asks for the written quote, and later the invoice. If needed, we prepare our quote with the item layout the bank asks for.
Buildings with flat, sound render, few balconies and a roof that is easy to reach come out cheaper per square metre. Facades with many projections or window surrounds, facades that need repair, or roofs that are hard to reach push the price up.