Facade renovation · Thermal insulation
External Wall Insulation: Repair, Partial Areas and High Sections
Most of the external wall insulation enquiries we receive cover only part of a building, not the whole of it: repairs to insulation that is bulging or cracking, facades left unfinished, and high sections where scaffolding is hard to put up. We do this work without scaffolding, descending by rope from the roof.
When external wall insulation needs repairing, the cost of scaffolding can easily exceed the repair itself. This is where working on ropes saves the most.

External Wall Insulation Repair: Bulging, Cracking and Detached Areas
Cracked render and mesh lines
Hairline cracks appear in the top coat of render, or straight lines that follow the joints between boards. Most often the mesh was overlapped too little or the render was applied too thin.
Bulging or detached boards
If too little adhesive was applied or fixings are missing, a board moves in the wind, bulges and sometimes comes away. On the upper floors that means pieces falling to the ground.
Impact damage and holes
Holes drilled to fit air conditioners, satellite dishes or awnings, and damage from birds and impacts, let water in behind the board.
Joints that take in water
Water that gets in at window sills, the plinth and parapet junctions collects behind the board and makes the render swell.
Repair sequence
- The cause is found: water ingress, missing fixings or an impact?
- The damaged area is cut out back to sound board, and the wall behind it is dried.
- Board of the same type and thickness is fitted, and the new mesh is tied into the existing render.
- The top coat is applied in a shade close to the existing colour; if you do not want any colour difference, the whole of that facade is painted.
External Wall Insulation Without Scaffolding: Single Facade, Gable Wall and Upper Floors
A single facade
The facade that loses the most heat, such as the north or west side, is insulated; the others are left for a later budget.
Gable wall
A blank wall exposed when the neighbouring building is demolished or built higher is covered; there is no need to enter the neighbouring plot for scaffolding.
Upper floors
The top-floor flats, which lose the most heat, are insulated without taking scaffolding to the full height.
Light wells and rear facades
Scaffolding does not fit in narrow air gaps; these surfaces are reached by descending on ropes.
In rope-access insulation work the facade is divided into vertical strips running down from the anchor points on the roof. The technician descends from top to bottom on a seat harness; once the boards, fixings and render of one strip are done, the technician moves on to the next strip alongside.
We are based in Ankara. For insulation work in other provinces of Türkiye, the team and rope equipment are taken to the site and stay there until the job is finished.
- On the roof
- The ropes are tied to sound structural points on the roof or to a temporary anchor system. We decide on the attachment points at the site survey.
- On the facade
- Every descent line has two ropes, one for working and one as a backup. Buckets of boards and render are also carried on a rope.
- On the ground
- Only room for a stack of materials and a safety strip is set aside. The car park, building entrance and garden stay in use.
How Is External Wall Insulation Installed? The Process in Six Steps
- 01
Surface check and repair
Loose render, blistering paint and cracks are cleared. The surface the board will bond to must be sound and flat; noticeable unevenness is levelled with repair mortar.
- 02
Plinth profile
An aluminium starter profile is fitted a little above ground level. The first row of boards sits on this profile, so the bottom edge finishes in a straight line.
- 03
Bonding the boards
Adhesive is applied in a strip around the edges of the board and in dabs in the middle, and the board is pressed to the wall. The boards are laid staggered like brickwork; at window corners a single L-shaped cut piece is used.
- 04
Mechanical fixing
Once the adhesive has set, every board is also fixed mechanically with plugs suited to the type of wall. The number of fixings per square metre rises with building height and wind load.
- 05
Base coat of render with mesh
Glass-fibre mesh is embedded in the first coat of render, with an overlap of at least 10 cm at the joints. Diagonal reinforcement goes in at window corners and corner beads at external corners.
- 06
Top coat and inspection
Once the base coat has dried, a decorative top coat of render or paint goes on. When all the strips are finished, the facade is inspected from the ground and from the roof together with the building management.

Stone Wool or EPS? Choosing the Board
| Feature | Stone wool | EPS |
|---|---|---|
| Raw material | Mineral fibre made from basalt rock | Expanded polystyrene; the grey type with a carbon additive insulates better |
| Fire behaviour | Class A1, non-combustible | Combustible class; on a tall building, fire barriers at floor level may be required |
| Vapour permeability | High; lets moisture in the wall escape outwards | Lower; on a wall with a damp problem, the source has to be dealt with first |
| Sound | Its fibrous structure reduces outside noise to some extent | Its contribution to sound insulation is limited |
| Weight | Heavier; needs more fixings and careful handling | Light; easy to carry on a rope |
| Budget | Higher cost per square metre | More economical |
For a repair the choice is easy: use the same type and thickness as the existing board, otherwise the new section leaves a visible mark on the wall. For new work, we recommend stone wool on tall blocks and in buildings where the fire rules call for non-combustible insulation, and graphite EPS on low-rise buildings with a limited budget. In the plinth zone close to the ground, water-resistant XPS board is used.
We explain how the choice of board feeds into the quote on our page about the items that make up external wall insulation pricing.
What Happens on Survey Day?
- You share a few photos of the damaged area and of the building, together with the number of storeys, by phone or message.
- The team examines the roof, the anchor points and the wall around the damage on site.
- The surface to be repaired or insulated is measured, and window and balcony openings are deducted.
- The board type, thickness and duration are written into the quote item by item.
Which External Wall Insulation Jobs Make Sense on Ropes?
- Suitable
Damaged insulation
Areas that are bulging, cracking, hit by impacts or torn off by the wind. For a small repair, putting up scaffolding usually costs more than the job itself.
- Suitable
Partial areas and upper floors
A single facade, a gable wall, the top-floor level or the roof void. The gap is widest on jobs where scaffolding would have to go up to the full height.
- Suitable
The whole of a tall building
We also insulate a whole multi-storey block from scratch on ropes; because there is no scaffold hire or erection, the total comes in below a scaffolded job.
- Suitable
Terraced buildings and buildings on narrow streets
Putting scaffolding on a pavement usually needs a permit and arrangements for pedestrians. With rope access, a few square metres on the ground are enough.
- Suitable
Institutional buildings in use
At a hospital, school or public building, no permanent walkway is put up in front of the windows; the team is only in front of the strip it is working on.
- Out of scope
Buildings of one or two storeys
At this height the facade can be reached from the ground or from a small scaffold; setting up ropes gives no advantage. Our lower limit for building work is three storeys.
Questions About External Wall Insulation
For a topic that is not on the list, you can send a photo of the damaged area and ask us directly.
If you do not want insulation: our painting pageHow is external wall insulation repaired?
First the cause of the damage is found: water getting in, a missing fixing or an impact. The damaged section is cut out back to sound board, a board of the same type and thickness is bonded in its place and fixed with plugs. The new mesh is lapped over the old render, and the top coat is applied in a shade close to the existing colour.
How are cracks in external wall insulation repaired?
Hairline cracks are opened up, cleaned and closed with a thin mesh-reinforced render coat. Straight cracks that follow the board joints most likely come from a missing mesh overlap; in that case the render is scraped back along the crack line and new mesh is embedded. Painting over a crack only hides the problem for a season or two.
What is external wall insulation?
External wall insulation (EWI) means wrapping the outer walls of a building in insulation boards, like a coat. The boards are bonded to the wall and fixed with plugs, protected with mesh-embedded render and finished with a decorative top coat. The aim is to slow the heat leaving the building in winter and the heat passing through the wall into the building in summer.
What is thermal insulation, and is it the same as external wall insulation?
Thermal insulation is the common name for all the measures that reduce heat transfer between inside and outside in a building; the roof, ground floor slab, pipework and window frames also come under it. External wall insulation is the part of it applied to the outer walls. The work we describe on this page covers only the facade.
How is external thermal insulation of a facade carried out?
First the surface is repaired, then the boards are bonded, fixed with plugs and covered with mesh-embedded render; the decorative coat comes last. We follow the same sequence by dividing the facade into vertical strips and finishing each strip on the ropes.
Is external wall insulation compulsory for an apartment block?
In newly built buildings, thermal insulation is required by regulation. In an existing block, the decision to insulate is taken by the flat owners’ meeting, and the cost is usually shared according to each flat’s land share. For legal details such as the voting quorum and how to object, we recommend asking your building management’s adviser.
Do we have to leave the flat while the work is going on?
No. All the work is done from the outside. On the day the team reaches your window, we ask you to close the curtains and leave nothing on the balcony. The noise of drilling for the plugs is heard for a few hours during the day.

