Curtain wall · Sealing
Glass Replacement and Facade Silicone Resealing
On a curtain wall, once the facade silicone has aged, water runs in along the edge of the glass; a broken or misted pane spoils both the appearance and safety. We do both jobs without a cherry picker or scaffolding, with the same team descending on ropes fixed to the roof: we cut out leaking silicone and run it again, and we take out the damaged glass and fit a new unit.
The technicians who come for a glass replacement also renew the tired silicone on that strip on the same descent. Because the rope system is set up once, the second job does not create a separate set-up cost.

Five Signs a Silicone Facade Needs Renewing
- 1.
Silicone pulling away from the edge
Joint resealedA hair-thin gap opens between the joint filler and the edge of the panel; when pressed, the filler cracks instead of flexing.
- 2.
Water marks inside after rain
Joint resealedDamp appears at the edge of the window, on the sill or on the ceiling. The water usually gets in through a joint a few metres higher up.
- 3.
Darkened joints that hold dirt
Joint resealedFiller whose surface has started to collect dust has lost its elasticity; black streaks run down the surface.
- 4.
Mist inside the double glazing
Unit replacedMoisture has got into the space between the two layers of the unit. Resealing the joint will not cure this; the double-glazed unit has to be replaced.
- 5.
Cracked or broken glass
Unit replacedFrom impact, temperature difference or spontaneous breakage of toughened glass. If a piece could fall, the ground must be made safe at once.
Facade Glass Replacement: The Same Team, the Same Rope Line

Shared equipment for both jobs
- Suction-cup lifters
- Cutting knives and spatulas
- Primer, backer rod and neutral-cure silicone
- Pulley and lowering system set up on the roof
Replacement sequence
- Measurements are taken; the unit, with its type, thickness and colour specified, is ordered from the manufacturer.
- The area on the ground where glass could fall is taped off.
- The surrounding joints are cut and the broken panel is held by suction cups and taken out.
- The new unit is lowered from the roof by pulley, wedged and seated in place.
- The joints are sealed with neutral-cure silicone and a water check is made from the inside.
For very large or heavy panes we plan the lifting arrangement separately at the survey. Until the new one arrives, the broken panel is taped up or taken out under control.
Send a Photo and We Will Tell You: Replacement or Resealing
- There is a broken pane on our facade and I am sending a photo. What is needed to replace it?
- Water gets in along the edges of the glass when it rains. We would like a survey for silicone resealing.
- Our double-glazed units have misted up inside. Can we get a quote for replacement?
- The joint silicone on our office tower has darkened and cracked. Can you draw up a renewal plan?
Steps for Resealing a Silicone Curtain Wall
Removal
The old silicone is cut along both edges and pulled out in a strip, and the remains are scraped off.
Cleaning
Both edges of the joint are wiped with solvent; no dust or grease may be left.
Primer
Primer is applied to the surfaces the manufacturer specifies, and we wait for it to dry.
Backer rod
The depth of the joint is set with foam backer rod; the silicone bonds to the two edges, not to the bottom.
Neutral-cure silicone
A neutral-cure product is used, because acetic-cure silicone can damage aluminium and the edge tape of double-glazed units.
Tooling
The surface is pressed with a spatula, the masking tape is removed and the joint is inspected along its full length.
Silicone must not get rained on while it cures, so we do not remove it on days when rain is expected. On any one strip, removal and new silicone are finished on the same day wherever possible; a joint is never left open overnight.
What Does the Cost of Facade Silicone per m² Depend On?
When you compare quotes for facade silicone, check that the joint length, the removal and the product to be used are each written separately. We, too, give the figure in writing after the survey, together with the joint length and, if there are any, the list of units to be replaced.
Panel size
On a facade with 1.5 × 1.5 m panels there are about 1.3 metres of joint per square metre; with 3 × 1.5 m panels this falls to 1 metre.
Joint section
The wider and deeper the joint, the more silicone is used per metre.
Condition of the old silicone
There is a difference of hours of work between silicone that peels off easily and a layer that has stuck to the glass.
Cost of new glass
Toughened, laminated, double-glazed or coated: the cost, size and type of the unit are covered by the manufacturer’s price.
Height and spread
If the joints to be renewed are scattered across the facade, the rope system has to be moved more often.
Capped, Silicone and Point-Fixed Facades: What Is Done on Which System?
| Facade system | Where the silicone is renewed | How the panel is removed |
|---|---|---|
| Capped curtain wall | Cap and gasket junctions, corners and floor-slab lines | The cap and pressure profile are removed, the panel is taken out from outside and a new one is fitted. |
| Silicone facade | All vertical and horizontal joints between panes | The method is decided at the survey, according to how the glass is connected to the frame. |
| Point-fixed (spider) facade | Between panels and around the fixing heads | The fixing heads are loosened and the new pane is seated on the same points. |
| Mixed facade (panel and glass) | Where panel and glass meet, and around windows | The window glass is replaced without removing the panel around it. |
The filler in concrete panels and expansion gaps needs a different material; we describe that work on our joints page.
The surface is cleaned before the joints are renewed. For buildings that have regular window cleaning done, we tie the two jobs to the same descents.
Questions on Curtain Wall Maintenance
For a broken panel that could fall, please call instead of writing; first let us talk about how to make the ground safe.
What is a structural glazing facade?
It is a curtain wall system in which the glass is fixed to the load-bearing aluminium profile with structural silicone, without a cover cap visible from outside. Seen from outside, only thin silicone joints show between the panes. These joints keep out water and air; because they age with sun and building movement, they are checked and renewed at intervals.
What happens when the facade silicone fails?
The first sign is water getting in: after rain, dampness shows at the window edge, on the sill or on the ceiling. Water can travel inside the profiles and damage the insulation and the interior; a panel whose joint has opened starts to make noise in windy weather. If there is a suspicion of a problem with the structural silicone that holds the glass, it must be checked without waiting, because this is a matter of falling risk.
How is a structural glazing facade built?
In a new structural glazing facade, the glass is bonded to aluminium frames with structural silicone in the workshop, and the silicone is left to cure. The frames are then fitted to the load-bearing system of the building, and the joints between them are sealed with weather-resistant silicone. We do not build new facades; we take on replacing the glass in an existing facade and renewing the joint silicone.
How often should facade silicone be renewed?
It would not be right to give a single period: the type of product, the direction the facade faces the sun and the movement of the building change its life. Ageing usually starts earlier on south and west faces. We recommend a close check of the joints every few years, and renewing sections that show separation or cracks without waiting for the whole facade.
What is done about broken glass until the new pane arrives?
First the area below is cordoned off with tape. If the broken panel is still in place, it is taped to hold it; if it might fall apart, a technician descends on ropes, removes it in a controlled way and the opening is covered temporarily. The time it takes to make the new glass varies with its type and the supplier.

