Facade Painting Labour Costs: How the Price Is Built

The labour cost of facade painting depends on the condition of the surface, the paint class, the shape of the facade and the number of storeys. That is why we do not publish figures on the site; on this page we explain how the area is measured and what each line in a quote covers.

We start by working out the surface to be painted on a four-storey apartment block as an example.

Lines we itemise separately in our quote

  • Surface preparation and repair
  • Primer
  • Two top coats
  • Paint material: class, brand and colour code
  • Rope set-up
  • Whether VAT is included

Facade Painting Cost for a 4-Storey Building: How Is the Area Measured?

Our example is a four-storey apartment block with a 18 × 12 m footprint and 8 flats. The storey height is 2.9 m, and the allowance for windows and balconies is 15 per cent.
  1. Perimeter: (18 + 12) × 2 = 60 m
  2. Gross wall area: 60 m × 4 storeys × 2.9 m = 696 m²
  3. Net area to be painted: 696 × 0.85 ≈ 592 m²
  4. Area per flat: 592 ÷ 8 ≈ 74 m²

In this building’s quote

Labour line
592 m² × labour unit rate
Material line
592 m² × unit rate of the chosen paint class

The example leaves out balcony undersides, eaves and the inner faces of parapets; these are measured separately at the survey and added to the area.

Technicians descending by rope from the roof of a multi-storey building to paint the facade

What Changes the Cost per Square Metre of Facade Painting

Even on the same building, two elevations can come out at different rates per square metre. The difference mostly comes from these five things.
Condition of the surface
Blistering paint, hairline cracks, algae or crumbling render lengthen the preparation time. On a sound surface, washing and primer are often enough.
Paint class
Acrylic, silicone-based and elastomeric products differ in material cost; we choose the class together with you, based on the condition of the surface.
Shape of the facade
The more balconies, reveals, projections and colour breaks there are, the more masking and fine work is needed. A flat facade moves faster in the same time.
Roof and anchor locations
How easy the roof is to reach, where the ropes can be fixed and how many descent lines are needed decide how long the set-up takes.
Number of storeys
More storeys mean a bigger surface to paint, but the effect on the rate per square metre stays limited. We show the detail below, by number of storeys.

Apartment Facade Painting Costs by Number of Storeys

We worked out the same 18 × 12 m footprint at different heights. It is the surface that makes the total bigger; the rate per square metre depends more on the condition of the surface and the paint class.
  • 3-storey building

    Surface to be painted
    ≈ 444 m²
    Each rope descent
    ≈ 8.7 m
  • 5-storey building

    Surface to be painted
    ≈ 740 m²
    Each rope descent
    ≈ 14.5 m
  • 8-storey building

    Surface to be painted
    ≈ 1,183 m²
    Each rope descent
    ≈ 23.2 m
  • 12-storey building

    Surface to be painted
    ≈ 1,775 m²
    Each rope descent
    ≈ 34.8 m

The rope system is set up once and divided into longer descents, so on a tall building the set-up share per square metre gets smaller. With scaffolding it is the other way round: the scaffold line grows quickly as the building rises.

How Would the Bill Change If Scaffolding Were Used?

When we work on ropes, the cost of access is included in the labour. A management that has the same job done with scaffolding pays these four items on top of the labour.
  • Hire

    It runs for as long as the job does, and it does not stop on days when rain prevents painting.

  • Transport

    Tubes, platforms and protective netting are brought to the building and taken away again at the end.

  • Erection and dismantling

    A job that takes days and grows with the perimeter and height of the building.

  • Anchoring

    The higher the scaffold rises, the more ties are made to the facade; the holes are filled at the end of the job.

The difference grows with height: the scaffold stays up longer, needs more anchoring and more material is hired for the same period. On a tall block, the scaffold line can grow to rival the labour itself.

On a building of one or two storeys the opposite is true; there a small scaffold is usually the most economical way. That is also why we start building work from three storeys.

Labour Items: Where the Money Goes

Labour is made up of four items. On heavily weathered surfaces the share of preparation grows noticeably.

Surface preparation is the most variable item. If, on the same building, the north face has algae and the south face has an old coating turning to powder, even the preparation times of the two sides differ; at the survey we note each elevation separately.

Primer and top coats are more predictable once the surface is ready. At this stage it is mainly the weather that decides the time.

  • Surface preparation

    Washing, scraping loose paint, repairing cracks and render

  • Primer

    One coat of primer that evens out absorbency

  • Top coats

    By roller and brush, in two layers

  • Rope set-up

    Roof anchors, descent lines, safety tape on the ground

Facade Painting Costs and Paint Class

The choice that changes the total most is the paint class. In the quote, labour and material are written on separate lines, so the effect of changing class on the total can be seen clearly.
  • Acrylic-based

    Enough on sound, crack-free render; the economy class.

  • Silicone-based

    Repels water and lets vapour through; more resistant to dirt.

  • Elastomeric

    A flexible film that bridges hairline cracks; preferred on cracked surfaces.

On new, sound render an acrylic class is enough. On elevations that take rain and exhaust fumes and get dirty quickly, a silicone-based product keeps clean for longer. On old render with hairline cracks, an elastomeric top coat delays the cracks showing through again.

We decide which class is enough by looking at the condition of the surface. We have described the application steps and the weather conditions on our facade painting page.

Three Pieces of Information Are Enough for a Preliminary Quote

With this information we can give you a preliminary range; the exact figure is fixed after the survey.
  1. The district where the building is and its number of storeys
  2. One photo of each facade, and close-ups of any blistering or cracking areas
  3. The product class or colour code you have in mind

Answers About Painting Labour

Does the facade painting labour price include the paint?

No. Labour covers surface preparation, the primer and the application of two topcoats. The paint material is written on a separate line in the quote, with its class and brand; we choose the class together, looking at the condition of the surface.

Does the labour price include surface repair?

Washing, scraping off loose coating and filling hairline cracks are included. Work such as renewing crumbled render, repairing deep cracks or replacing rusted ironwork is seen at the site survey and written separately in the quote.

How is the area measured for facade painting?

The measurement is taken from the real surface of the wall: building perimeter × storey height × number of storeys, minus window and door openings. Window returns, soffits and parapet faces are also painted, so they are added separately at the site survey.

Is the cost of scaffolding added to the painting price?

There is no scaffolding item in our quotes; the rope rigging is included in the labour. In the quote of a company that works with scaffolding, the scaffolding is usually a separate item made up of hire, transport, erection and dismantling, and it grows as the building gets taller.

Does the number of storeys change the painting price?

It changes the total, because the surface to be painted gets larger. When working on ropes, the rigging on the roof is done once and the work is divided into longer descents; so in a building with many storeys, the share of the rigging per square metre gets smaller.